ok

Designing:
Project design of various telecommunications facilities

To show still...


Technical maintenance of OFTL.
Maintenance of linear structures in accordance with the technical rules and requirements of the

To show still...


Engineering follow-up.
Incoming inspection of materials supplied by the General Contractor for their compliance with the technical requirements, parameters, design documentation, availability of certificates, etc.

To show still...


OFTL construction

To show still...

VOLSProekt Stroi LLP employs highly-qualified professionals that have successfully conducted the engineering follow-up over the construction of OFTL trunks with a total length of 4736 km:

Almaty-Taraz-Shymkent;
Astana-Karaganda-Almaty;
Shymkent-Kyzylorda-Zhezkazgan-
Karaganda;
Astana-Kokshetau- Petropavlovsk;
Shymkent- Uzbekistan border;
Kordai-Kyrgyzstan border. And construction of 157-km long local OFTL in the cities of: Almaty, Shymkent, Kyzylorda, Aktobe, Uralsk, Zhezkazgan, Kokshetau, Karaganda, Taraz, Aksai.

.

FOR THE OFTL TECHNICAL MAINTENANCE, ENGINEERING FOLLOW-UP AND CONSTRUCTION THERE ARE IN PLASE

  • Maintenance Centers (MC) in the cities of Almaty, Astana, Kokshetau, Karaganda, Zhezkazgan, Kyzylorda, Shymkent, Taraz, Shu, Balkhash. It is planned to open new MCs in Pavlodar, Semei, Oskemen, Petropavlovsk;
  • Well-equipped Control and Development Service. Both the Service and maintenance centers have the highly qualified staff and logistics base;
  • Current Management Service operating round oclock;
  • Twenty vehicles: UAZ-39094 8 units, UAZ-3909-2 units, Niva -7 units, Pick-up Dandong Major Pickup -1 unit, Mitsubishi Pajero;
  • 11 welding units, c/w chipper and NIM-25 tool;
  • 11 reflectometers and complete sets of tools for each MC (markers, Fibrlok temporary insert kit, portable 3-kW diesel generator, electrical chisel hammer, angle grinder, etc.).

Technical maintenance and monitoring over:

  • Optical fiber lines (SDH rings) in the cities of Astana, Almaty, Kyzylorda, Taraz, Shymkent, Karaganda, Zhezkazgan, Taldykorgan, Kokshetau, Uralsk, Aktobe, Atyrau, Aksai, Aktau, Pavlodar, Semei, Oskemen, Petropavlovsk, Kostanai;
  • OFTL trunks: Almaty-Taraz-Shymkent, Astana-Karaganda-Almaty, Shymkent- Kyzylorda- Zhezkazgan Karaganda, Astana-Kokshetau-Petropavlovsk, Shymkent-Uzbekistan border and Kordai-Kyrgyzstan border;
  • State of diesel generator units (DGU) at unmanned regeneration stations (URS) along the OFTL trunks of Shymkent-Kyzylorda- Zhezkazgan Karaganda, Astana-Karaganda-Almaty, Astana-Kokshetau- Petropavlovsk and Shymkent-Uzbekistan border;
  • Diesel generator units at mobile communications base stations located in Kyzylorda and South Kazakhstan Oblasts.
The main | About Company | Our clients | The contact information
© 2010 VOLSProekt Stroy. All Rights Reserved
- , , -